V Model

The V – model is SDLC model where execution of processes happens in a sequential manner in V-shape. It is also known as Verification and Validation model.

V – Model is an extension of the waterfall model and is based on association of a testing phase for each corresponding development stage. This means that for every single phase in the development cycle there is a directly associated testing phase. This is a highly disciplined model and next phase starts only after completion of the previous phase.

Under V-Model, the corresponding testing phase of the development phase is planned in parallel. So there are Verification phases on one side of the .V. and Validation phases on the other side. Coding phase joins the two sides of the V-Model.

vmodel

Advantages of V-model:

  • Simple and easy to use.
  • Testing activities like planning, designs  happens well before coding. This saves a lot of time. Hence higher chance of success over the waterfall model.
  • Proactive defect tracking – that is defects are found at early stage.
  • Avoids the downward flow of the defects.
  • Works well for small projects where requirements are easily understood.

Disadvantages of V-model:

  • Very rigid and least flexible.
  • Software is developed during the implementation phase, so no early prototypes of the software are produced.
  • If any changes happen in midway, then the test documents along with requirement documents has to be updated.

 

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *